Greenspector Documentation has been moved.
Please go to
https://greenspectorstudio.atlassian.net/l/cp/TDhqYDSu
Configure the budgets
UP TO DATE
Step-by-step guide
- Go to the Budgets view.
- Activate the steps you want to control with the switch box.
- You see the actual measurement. Set the budget value for one metric or more.
- Validate the budgets with the validate button. Once validated, budget data are displayed in:
- green if measures respect the configured budget (it's ok!);
- orange if the average of measures is near the configured bugdet (warning!);
- red if the budget is not respected.
- You can click on the magnifying glass to see the measures on the Meter view.
You need to have at least 3 iterations for each test cases to activate budgets. If not, budget data are displayed in gray.
Related articles
Filter by label
There are no items with the selected labels at this time.