Greenspector Documentation has been moved.
Please go to

https://greenspectorstudio.atlassian.net/l/cp/TDhqYDSu

Metrics List

Redirection

UP TO DATE





Resource and network metrics

Composant

Metric

API key for Metric

Unit

Description

Composant

Metric

API key for Metric

Unit

Description

Platform

Platform CPU

C_PL

%

Average of CPU consumed by the platform.

Platform Max Power

PMAX_PL

W

Maximum power consumed by the platform.

Platform Discharge

AH_PL

nAh

Total of ampere hour consumed by the platform.

Platform Discharge per second

AH_PL/s

nAh/s

Average ampere hour by second consumed by the platform.

Test duration

TT_PL

s

Test duration

Process

Process CPU

C_ID

%

Average of CPU consumed by the process.

Process Memory

M_ID

B

Average of memory consumed by the process (PSS memory).

Process Data

D_ID

B

Total of network data exchanged (in and out) by the process.

Network Packets Peak

MAX_O_DPacket_ID

Integer

The max number of packets exchanged (tcp and udp in and out)Ā by the process.

Total Network Packets

TOTAL_O_DPacket_ID

Integer

The total number of packets exchanged (tcp and udp in and out)Ā by the process.



Android system metrics

Metric

Description

Metric

Description

Activities

Number of current activities.

Application Contexts

Number of the application contexts.

Managers of in use assets

Number of resource managers used.

In use assets

Number of loaded into memory resources.

Death Recipients

Number of interface for receiving a callback when the process hosting has gone away.

SSL Sockets opened

Number of open SSL sockets.

Loaded root views

Number of window or dialog box active for the current activity.

Loaded views

Number of component inheriting the View interface loaded into memory.

Rendered frames

Number of frames. This value is calculated by taking the difference of frames between the start and end of test.

Rendered frames with slow loading

Number of frames putting more than 16ms to charge. This value is calculated by taking the difference of frames between the start and end of the test.